A workshop rescheduling algorithm to solve producing anomaly

Rong Dong, Wei Ping He, Ya Jie Li, Wen Rui He

科研成果: 书/报告/会议事项章节会议稿件同行评审

1 引用 (Scopus)

摘要

Owing to the complexity of the production environment the rescheduling has become the core problem in the workshop management. This paper analyzed the dynamic disturbances in the production environment, build a mathematic model and then present a workshop rescheduling algorithm based on the Rescheduling List, which could gather to-be-rescheduled procedures to shorten the searching space. The algorithm are used when operating on the results of production schedule, and can maximize in step with the original workshop production scheduling on the basis of continuously optimized. Finally, a machining example is used to expound the rescheduling algorithm, and the results show that the proposed workshop rescheduling algorithm has acceptable feasibility.

源语言英语
主期刊名2010 IEEE International Conference on Mechatronics and Automation, ICMA 2010
1994-1997
页数4
DOI
出版状态已出版 - 2010
活动2010 IEEE International Conference on Mechatronics and Automation, ICMA 2010 - Xi'an, 中国
期限: 4 8月 20107 8月 2010

出版系列

姓名2010 IEEE International Conference on Mechatronics and Automation, ICMA 2010

会议

会议2010 IEEE International Conference on Mechatronics and Automation, ICMA 2010
国家/地区中国
Xi'an
时期4/08/107/08/10

指纹

探究 'A workshop rescheduling algorithm to solve producing anomaly' 的科研主题。它们共同构成独一无二的指纹。

引用此