A workshop rescheduling algorithm to solve producing anomaly

Rong Dong, Wei Ping He, Ya Jie Li, Wen Rui He

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Scopus citations

Abstract

Owing to the complexity of the production environment the rescheduling has become the core problem in the workshop management. This paper analyzed the dynamic disturbances in the production environment, build a mathematic model and then present a workshop rescheduling algorithm based on the Rescheduling List, which could gather to-be-rescheduled procedures to shorten the searching space. The algorithm are used when operating on the results of production schedule, and can maximize in step with the original workshop production scheduling on the basis of continuously optimized. Finally, a machining example is used to expound the rescheduling algorithm, and the results show that the proposed workshop rescheduling algorithm has acceptable feasibility.

Original languageEnglish
Title of host publication2010 IEEE International Conference on Mechatronics and Automation, ICMA 2010
Pages1994-1997
Number of pages4
DOIs
StatePublished - 2010
Event2010 IEEE International Conference on Mechatronics and Automation, ICMA 2010 - Xi'an, China
Duration: 4 Aug 20107 Aug 2010

Publication series

Name2010 IEEE International Conference on Mechatronics and Automation, ICMA 2010

Conference

Conference2010 IEEE International Conference on Mechatronics and Automation, ICMA 2010
Country/TerritoryChina
CityXi'an
Period4/08/107/08/10

Fingerprint

Dive into the research topics of 'A workshop rescheduling algorithm to solve producing anomaly'. Together they form a unique fingerprint.

Cite this