Scheduling problems in automated production systems based on processing times classification

Peng Yu Yan, A. Da Che, Xiao Wo Tang

科研成果: 期刊稿件文章同行评审

6 引用 (Scopus)

摘要

To realize reasonable planning and scheduling of parts transportation and improve efficiency of automatic production systems, according to the constraint feature of parts processing time, the scheduling problem in automated production systems from various applications were classified into three types, such as no-wait, limited-wait and indefinite-wait. The main research ideas, algorithm techniques and time complexity calculation of three types were systematically reviewed and summarized, and the future research trends were discussed.

源语言英语
页(从-至)332-341
页数10
期刊Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
18
2
出版状态已出版 - 2月 2012

指纹

探究 'Scheduling problems in automated production systems based on processing times classification' 的科研主题。它们共同构成独一无二的指纹。

引用此