TY - JOUR
T1 - Fuzzy grey model of base level maintenance time for torpedo weapon system
AU - Liang, Qingwei
AU - Song, Baowei
AU - Pan, Guang
PY - 2006/9/20
Y1 - 2006/9/20
N2 - The maintenance cost of base level for torpedo weapon system is the highest in the three levels maintenance costs. The maintenance time of base level should be forecasted to use money in reason. Based on the thought of fuzzy theory, the AGM(l, l, ω) model is brought forward, which is developed form of grey GM(1, 1) model. At the same time, AHP method is used in confirming the best weight value of the AGM(l, l, ω) model. As an example, a model of base level maintenance time model for torpedo weapon system is set up. Result indicates that this method can achieve satisfactory precision, and has practical value.
AB - The maintenance cost of base level for torpedo weapon system is the highest in the three levels maintenance costs. The maintenance time of base level should be forecasted to use money in reason. Based on the thought of fuzzy theory, the AGM(l, l, ω) model is brought forward, which is developed form of grey GM(1, 1) model. At the same time, AHP method is used in confirming the best weight value of the AGM(l, l, ω) model. As an example, a model of base level maintenance time model for torpedo weapon system is set up. Result indicates that this method can achieve satisfactory precision, and has practical value.
KW - Analytic hierarchy process
KW - Base level maintenance time
KW - Fuzzy grey AGM(l, l, ω) model
KW - Torpedo weapon system
UR - http://www.scopus.com/inward/record.url?scp=33750900621&partnerID=8YFLogxK
M3 - 文章
AN - SCOPUS:33750900621
SN - 1000-3428
VL - 32
SP - 17
EP - 19
JO - Jisuanji Gongcheng/Computer Engineering
JF - Jisuanji Gongcheng/Computer Engineering
IS - 18
ER -