Dynamic hoist scheduling problem with multi-capacity reentrant machines: A mixed integer programming approach

Jianguang Feng, Ada Che, Chengbin Chu

科研成果: 期刊稿件文章同行评审

32 引用 (Scopus)

摘要

Abstract This paper deals with the dynamic hoist scheduling problem with multi-capacity reentrant machines, where some reentrant machines have parallel processing units and can process multiple jobs at the same time. The system is served by a hoist for transporting jobs among machines. Jobs to be processed randomly arrive at the input station. When new jobs come, the system should be rescheduled so as to minimize the makespan. A mixed integer programming (MIP) model is developed to generate an optimal reschedule, which improves an existing model in the literature from several dimensions. The proposed model is solved by commercial software CPLEX. Computational results are reported to evaluate the proposed MIP model.

源语言英语
文章编号4074
页(从-至)611-620
页数10
期刊Computers and Industrial Engineering
87
DOI
出版状态已出版 - 9 7月 2015

指纹

探究 'Dynamic hoist scheduling problem with multi-capacity reentrant machines: A mixed integer programming approach' 的科研主题。它们共同构成独一无二的指纹。

引用此