Delay analysis and study of IEEE 802.11p based DSRC safety communication in a highway environment

Yuan Yao, Lei Rao, Xue Liu, Xingshe Zhou

科研成果: 书/报告/会议事项章节会议稿件同行评审

86 引用 (Scopus)

摘要

As a key enabling technology for the next generation inter-vehicle safety communications, The IEEE 802.11p protocol is currently attracting much attention. Many inter-vehicle safety communications have stringent real-time requirements on broadcast messages to ensure drivers have enough reaction time toward emergencies. Most existing studies only focus on the average delay performance of IEEE 802.11p, which only contains very limited information of the real capacity for inter-vehicle communication. In this paper, we propose an analytical model, showing the performance of broadcast under IEEE 802.11p in terms of the mean, deviation and probability distribution of the MAC access delay. Comparison with the NS-2 simulations validates the accuracy of the proposed analytical model. In addition, we show that the exponential distribution is a good approximation to the MAC access delay distribution. Numerical analysis indicates that the QoS support in IEEE 802.11p can provide relatively good performance guarantee for higher priority messages while fails to meet the real-time requirements of the lower priority messages.

源语言英语
主期刊名2013 Proceedings IEEE INFOCOM 2013
1591-1599
页数9
DOI
出版状态已出版 - 2013
活动32nd IEEE Conference on Computer Communications, IEEE INFOCOM 2013 - Turin, 意大利
期限: 14 4月 201319 4月 2013

出版系列

姓名Proceedings - IEEE INFOCOM
ISSN(印刷版)0743-166X

会议

会议32nd IEEE Conference on Computer Communications, IEEE INFOCOM 2013
国家/地区意大利
Turin
时期14/04/1319/04/13

指纹

探究 'Delay analysis and study of IEEE 802.11p based DSRC safety communication in a highway environment' 的科研主题。它们共同构成独一无二的指纹。

引用此