TY - JOUR
T1 - Collaborative manufacturing resources optimization deployment process model and its realization
AU - Yao, Chang Feng
AU - Zhang, Ding Hua
AU - Bu, Kun
AU - Wang, Wen Hu
AU - Ren, Jun Xue
PY - 2008/3
Y1 - 2008/3
N2 - To deal with networked collaborative manufacturing resources optimization deployment problem, a new conception, Agile Manufacturing Process (AMP) was defined. For the purpose of AMP's creation, the basic conception model and process model of manufacturing resources optimization deployment were constructed by taking processing flow as core. And the networked manufacturing resources optimization deployment process model was summarized as three basic sub-processes: Logical Manufacturing Unit (LMU)-Physical Manufacturing Unit (PMU) mapping, filtering PMU and AMP optimization and creation. Realization methods for these sub-processes were also provided. Finally, the establishments of networked manufacturing resources optimization deployment platforms were discussed, and the application process as well as operation result were analyzed by taking the turbine blade of an aero engine as a typical case. Feasibility and applicability of the process model were verified.
AB - To deal with networked collaborative manufacturing resources optimization deployment problem, a new conception, Agile Manufacturing Process (AMP) was defined. For the purpose of AMP's creation, the basic conception model and process model of manufacturing resources optimization deployment were constructed by taking processing flow as core. And the networked manufacturing resources optimization deployment process model was summarized as three basic sub-processes: Logical Manufacturing Unit (LMU)-Physical Manufacturing Unit (PMU) mapping, filtering PMU and AMP optimization and creation. Realization methods for these sub-processes were also provided. Finally, the establishments of networked manufacturing resources optimization deployment platforms were discussed, and the application process as well as operation result were analyzed by taking the turbine blade of an aero engine as a typical case. Feasibility and applicability of the process model were verified.
KW - Agility manufacturing process
KW - Executive manufacturing process
KW - Logical manufacturing process
KW - Logical manufacturing unit
KW - Physical manufacturing unit
KW - Resources optimization deployment
UR - http://www.scopus.com/inward/record.url?scp=42549110812&partnerID=8YFLogxK
M3 - 文章
AN - SCOPUS:42549110812
SN - 1006-5911
VL - 14
SP - 455
EP - 461
JO - Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
JF - Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
IS - 3
ER -