Based on region division setup planning for sheet metal assembly in aviation industry

Ping Liu, Yuan Li, Kai Fu Zhang, Hui Cheng

科研成果: 期刊稿件文章同行评审

9 引用 (Scopus)

摘要

The task of setup planning is to determine the number and sequence of setups and the machining features or operations in each setup. Due to the locating method's character, the position of the locators may keep away joining tools from arriving at joining points during the joining process of sheet metal. In order to solve these problems, a novel method is proposed, which consists of three parts: (1) the points on the skin are divided into sets of supplied riveting and prior riveting points by convex hull generating method; (2) fixture vector is defined, and a suitable fixture region is generated by vector multiplication; and (3) the particle swarm optimization algorithm is applied to generate optimal setup scheme by setting up the parameters. The new setup planning approach can accomplish riveting work by minimum setup times and workpiece variation without finite element analysis software. At last, a certain kind of aircraft wing joining process is illustrated as an example to demonstrate the effect of the proposed approach.

源语言英语
页(从-至)153-161
页数9
期刊Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
227
1
DOI
出版状态已出版 - 1月 2013

指纹

探究 'Based on region division setup planning for sheet metal assembly in aviation industry' 的科研主题。它们共同构成独一无二的指纹。

引用此