Scheduling model and its algorithm for no-wait robotic cell with multiple robots

A. Da Che, Yuan Wang

Research output: Contribution to journalArticlepeer-review

2 Scopus citations

Abstract

A mathematical model for scheduling a no-wait robotic cell with multiple robots was developed by using forbidden intervals method. Based on the analysis of the developed mathematical model, it was proved that the optimal cycle time was the specific values for the cycle time. Next, a graph-based polynomial algorithm was proposed to check the feasibility of those specific values. Based on above work, an optimal polynomial algorithm was put forward to solve the no-wait scheduling problem. Finally, this algorithm was verified by an example from an electroplating line in Printed Circuit Board (PCB) manufacturing.

Original languageEnglish
Pages (from-to)525-534
Number of pages10
JournalJisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
Volume14
Issue number3
StatePublished - Mar 2008

Keywords

  • Multiple robots
  • No-wait
  • Polynomial algorithm
  • Robotic cell
  • Scheduling

Fingerprint

Dive into the research topics of 'Scheduling model and its algorithm for no-wait robotic cell with multiple robots'. Together they form a unique fingerprint.

Cite this