TY - JOUR
T1 - Novel decoupling method for time-dependent reliability-based design optimization
AU - Shi, Yan
AU - Lu, Zhenzhou
AU - Xu, Liyang
AU - Zhou, Yicheng
N1 - Publisher Copyright:
© 2019, Springer-Verlag GmbH Germany, part of Springer Nature.
PY - 2020/2/1
Y1 - 2020/2/1
N2 - Time-dependent reliability-based design optimization (RBDO) can provide the optimal design parameter solutions for the time-dependent structure, and thus plays a significant role in engineering application. Directly solving the time-dependent RBDO needs a nested double-loop optimization procedure, which undoubtedly leads to large computational costs. A novel decoupling method called two-step method (TSM) is proposed to efficiently solve the time-dependent RBDO. In the two-step method, the first step makes the minimum instantaneous reliability index satisfy the reliability target index by solving a transformed time-independent RBDO, and the second step performs time-dependent reliability analysis and deterministic optimization to obtain the optimal design parameters which meet the reliability target. Only a few time-dependent reliability analyses and several deterministic optimizations are involved in the proposed procedure; thus, the time-dependent RBDO can be efficiently solved. Several examples containing one numerical example and two engineering examples are introduced to show the effectiveness of the proposed TSM.
AB - Time-dependent reliability-based design optimization (RBDO) can provide the optimal design parameter solutions for the time-dependent structure, and thus plays a significant role in engineering application. Directly solving the time-dependent RBDO needs a nested double-loop optimization procedure, which undoubtedly leads to large computational costs. A novel decoupling method called two-step method (TSM) is proposed to efficiently solve the time-dependent RBDO. In the two-step method, the first step makes the minimum instantaneous reliability index satisfy the reliability target index by solving a transformed time-independent RBDO, and the second step performs time-dependent reliability analysis and deterministic optimization to obtain the optimal design parameters which meet the reliability target. Only a few time-dependent reliability analyses and several deterministic optimizations are involved in the proposed procedure; thus, the time-dependent RBDO can be efficiently solved. Several examples containing one numerical example and two engineering examples are introduced to show the effectiveness of the proposed TSM.
KW - Decoupling method
KW - Minimum instantaneous reliability
KW - Shifting vector increment
KW - Time-dependent RBDO
KW - Time-dependent reliability
UR - http://www.scopus.com/inward/record.url?scp=85070958498&partnerID=8YFLogxK
U2 - 10.1007/s00158-019-02371-y
DO - 10.1007/s00158-019-02371-y
M3 - 文章
AN - SCOPUS:85070958498
SN - 1615-147X
VL - 61
SP - 507
EP - 524
JO - Structural and Multidisciplinary Optimization
JF - Structural and Multidisciplinary Optimization
IS - 2
ER -