Hybrid branch and bound algorithms for the two-stage assembly scheduling problem with separated setup times

Jian Chao Luo, Zhi Qiang Liu, Ke Yi Xing

Research output: Contribution to journalArticlepeer-review

25 Scopus citations

Abstract

This article proposes hybrid branch and bound algorithms to minimise the makespan for the two-stage assembly scheduling problem with separated setup times. In the studied problem, there are multiple machines at the first stage, each of which produces a component of a job. When all components are available, a single assembly machine at the second stage completes the job. Existing algorithms are based on the state space search and hence suffer from the state space explosion problem. In order to reduce the search space, lower and upper bounds for a partial schedule are proposed. Also, a heuristic function and a dominance rule are developed to guide the search process. Moreover, accelerated factors are introduced to increase the speed of the search. Experimental results indicate that our algorithms outperform an existing method, and can find the optimal or near-optimal schedules in a short time for all tested problems with up to ten thousand jobs and nine first-stage machines.

Original languageEnglish
Pages (from-to)1398-1412
Number of pages15
JournalInternational Journal of Production Research
Volume57
Issue number5
DOIs
StatePublished - 4 Mar 2019

Keywords

  • branch and bound
  • scheduling
  • setup times
  • two-stage assembly

Fingerprint

Dive into the research topics of 'Hybrid branch and bound algorithms for the two-stage assembly scheduling problem with separated setup times'. Together they form a unique fingerprint.

Cite this