TY - JOUR
T1 - Appointed-time consensus
T2 - Accurate and practical designs
AU - Liu, Yongfang
AU - Zhao, Yu
AU - Ren, Wei
AU - Chen, Guanrong
N1 - Publisher Copyright:
© 2018 Elsevier Ltd
PY - 2018/3
Y1 - 2018/3
N2 - This paper investigates the appointed-time consensus problem under directed and periodical switching topologies. Here, the appointed finite time means that the consensus arriving time can be off-line pre-assigned according to task requirements without conservative estimation and is independent of the initial conditions of agents’ states. From a motion-planning perspective, a novel distributed appointed-time algorithm is developed for a multi-agent system with double-integrator dynamics. Under the assumption that the union of the directed periodical switching topologies contains a directed spanning tree, the proposed distributed algorithms can guarantee the multi-agent system to achieve consensus at an appointed time. Furthermore, the robustness and the practicability of the proposed algorithms are extended. It is the first time here to solve the finite- and appointed-time consensus problem for double-integrator systems under directed switching topologies.
AB - This paper investigates the appointed-time consensus problem under directed and periodical switching topologies. Here, the appointed finite time means that the consensus arriving time can be off-line pre-assigned according to task requirements without conservative estimation and is independent of the initial conditions of agents’ states. From a motion-planning perspective, a novel distributed appointed-time algorithm is developed for a multi-agent system with double-integrator dynamics. Under the assumption that the union of the directed periodical switching topologies contains a directed spanning tree, the proposed distributed algorithms can guarantee the multi-agent system to achieve consensus at an appointed time. Furthermore, the robustness and the practicability of the proposed algorithms are extended. It is the first time here to solve the finite- and appointed-time consensus problem for double-integrator systems under directed switching topologies.
KW - Appointed-time consensus
KW - Directed spanning tree
KW - Motion-planning approach
KW - Multi-agent system
UR - http://www.scopus.com/inward/record.url?scp=85041847862&partnerID=8YFLogxK
U2 - 10.1016/j.automatica.2017.12.030
DO - 10.1016/j.automatica.2017.12.030
M3 - 文章
AN - SCOPUS:85041847862
SN - 0005-1098
VL - 89
SP - 425
EP - 429
JO - Automatica
JF - Automatica
ER -