TY - JOUR
T1 - A maintenance-replacement optimization model under a renewable hybrid warranty
AU - Shang, Lijun
AU - Si, Shubin
AU - Cai, Zhiqiang
AU - Zhu, Wenjin
AU - Zou, Anquan
N1 - Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2021/2/2
Y1 - 2021/2/2
N2 - In this paper, firstly, a renewable hybrid warranty policy is proposed from the manufacturer's perspective. By integrating the replacement depending on number of failures and preventive maintenance at the expiration of the warranty, secondly, a maintenance-replacement policy is presented from the perspective of the customer. Thirdly, the consumer's expected cost rate model is obtained and the related special models are offered. Finally, a numerical example is used to illustrate performance of the proposed maintenance-replacement policy and to analyse sensitively. As showed in the example, performance of the proposed maintenance-replacement policy is more superior.
AB - In this paper, firstly, a renewable hybrid warranty policy is proposed from the manufacturer's perspective. By integrating the replacement depending on number of failures and preventive maintenance at the expiration of the warranty, secondly, a maintenance-replacement policy is presented from the perspective of the customer. Thirdly, the consumer's expected cost rate model is obtained and the related special models are offered. Finally, a numerical example is used to illustrate performance of the proposed maintenance-replacement policy and to analyse sensitively. As showed in the example, performance of the proposed maintenance-replacement policy is more superior.
UR - http://www.scopus.com/inward/record.url?scp=85101540474&partnerID=8YFLogxK
U2 - 10.1088/1757-899X/1043/3/032053
DO - 10.1088/1757-899X/1043/3/032053
M3 - 会议文章
AN - SCOPUS:85101540474
SN - 1757-8981
VL - 1043
JO - IOP Conference Series: Materials Science and Engineering
JF - IOP Conference Series: Materials Science and Engineering
IS - 3
M1 - 032053
T2 - 10th International Conference on Quality, Reliability, Risk, Maintenance,and Safety Engineering, QR2MSE 2020
Y2 - 8 October 2020 through 11 October 2020
ER -