TY - JOUR
T1 - Workshop-manager system based on component
AU - Si, Shubin
AU - Sun, Shudong
AU - Yang, Hongan
PY - 2005/10
Y1 - 2005/10
N2 - We aim at a workshop-manager system that overcomes a certain defect in the workshop-manager system of SAP company or ORACLE company (this defect is that their systems are not completely adaptable to the management of the manufacturing cell under conditions prevailing in China) and provides a scheduling algorithm base that is lacking in the results of much Chinese research[1-5]. Different from SAP's or ORACLE'S system, the workshop-manager system based on component developed by us is fully adaptable to the conditions in China. We establish the structure of our workshop-manager system; our system structure includes 5 layers: application soft layer, shell component layer, sustaining component layer, core component layer, virtual database layer. Our workshop-manager system's platform includes three bases: standard component base, current component base and scheduling algorithm base. Xi'an Engine Company has utilized our workshop-manager system in their management of manufacturing process and found it effective.
AB - We aim at a workshop-manager system that overcomes a certain defect in the workshop-manager system of SAP company or ORACLE company (this defect is that their systems are not completely adaptable to the management of the manufacturing cell under conditions prevailing in China) and provides a scheduling algorithm base that is lacking in the results of much Chinese research[1-5]. Different from SAP's or ORACLE'S system, the workshop-manager system based on component developed by us is fully adaptable to the conditions in China. We establish the structure of our workshop-manager system; our system structure includes 5 layers: application soft layer, shell component layer, sustaining component layer, core component layer, virtual database layer. Our workshop-manager system's platform includes three bases: standard component base, current component base and scheduling algorithm base. Xi'an Engine Company has utilized our workshop-manager system in their management of manufacturing process and found it effective.
KW - Component
KW - Scheduling algorithm base
KW - Workshop-manager system
UR - http://www.scopus.com/inward/record.url?scp=30044444366&partnerID=8YFLogxK
M3 - 文章
AN - SCOPUS:30044444366
SN - 1000-2758
VL - 23
SP - 633
EP - 636
JO - Xibei Gongye Daxue Xuebao/Journal of Northwestern Polytechnical University
JF - Xibei Gongye Daxue Xuebao/Journal of Northwestern Polytechnical University
IS - 5
ER -