The time delay existing in the data communication is a potential detriment to wide area power system control. This paper analyzes the impact of time delay to a multi-agent based power system stabilizing control with a co-simulation method. The co-simulation method uses two off-the-shelf softwares: MATLAB and OPNET to run the simulation concurrently. MATLAB is used to simulate the power systems and the controllers while OPNET is used to simulate the communication network with time delays. A two-area four-generator system is used as a case study. Simulation results not only demonstrate the latency impact on the performance of stabilizing control, but also indicate to what extent the following factors, network data rate, packet size, and background utilization, contribute to time delay. can degrade the performance of controls in the power systems.

源语言英语
主期刊名Proceedings of the 2011 - Grand Challenges in Modeling and Simulation Conference, GCMS 2011
356-361
页数6
出版状态已出版 - 2011
已对外发布
活动4th Grand Challenges in Modeling and Simulation Conference, GCMS 2011 - The Hague, 荷兰
期限: 27 6月 201130 6月 2011

出版系列

姓名Proceedings of the 2011 - Grand Challenges in Modeling and Simulation Conference, GCMS 2011

会议

会议4th Grand Challenges in Modeling and Simulation Conference, GCMS 2011
国家/地区荷兰
The Hague
时期27/06/1130/06/11

指纹

探究 'Using co-simulation method to analyze the communication delay impact in agent-based wide area power system stabilizing control' 的科研主题。它们共同构成独一无二的指纹。

引用此