Time value of life cycle cost for torpedo weapon system

Qing Wei Liang, Bao Wei Song, Jun Li

科研成果: 期刊稿件文章同行评审

摘要

Life cycle cost for torpedo weapon system is lasted for a long length of time, so the time value of the cost must be taken into account. Adopts triangle fuzzy number to show the interest rate and inflation rate. The convert rate from different year to benchmark year can be gained based on level sets and optimistic index, and then the cost of the torpedo weapon system in different year can be converted to the same year. This method can grasp the yardstick of how to treat the fuzzy factors and can reduce the influence of human beings.

源语言英语
页(从-至)2700-2702
页数3
期刊Xitong Fangzhen Xuebao / Journal of System Simulation
16
12
出版状态已出版 - 12月 2004

指纹

探究 'Time value of life cycle cost for torpedo weapon system' 的科研主题。它们共同构成独一无二的指纹。

引用此