摘要
To deal with cyclic scheduling problem of a complicated no-wait robotic production system in automatic manufacturing system which was characterized by its parallel work stations and re-enter work stations, a mathematical model was set up by a set of forbidden intervals for the cycle time. Then an optimal polynomial algorithm was developed. Effectiveness of the algorithm was verified by an application example of an electroplating line in Printed Circuit Board (PCB) manufacturing.
源语言 | 英语 |
---|---|
页(从-至) | 1616-1623 |
页数 | 8 |
期刊 | Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS |
卷 | 13 |
期 | 8 |
出版状态 | 已出版 - 8月 2007 |