Polynomial algorithm for cyclic scheduling of a complex no-wait robotic production system

A. Da Che, Peng Yu Yan, Nai Ding Yang

科研成果: 期刊稿件文章同行评审

4 引用 (Scopus)

摘要

To deal with cyclic scheduling problem of a complicated no-wait robotic production system in automatic manufacturing system which was characterized by its parallel work stations and re-enter work stations, a mathematical model was set up by a set of forbidden intervals for the cycle time. Then an optimal polynomial algorithm was developed. Effectiveness of the algorithm was verified by an application example of an electroplating line in Printed Circuit Board (PCB) manufacturing.

源语言英语
页(从-至)1616-1623
页数8
期刊Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
13
8
出版状态已出版 - 8月 2007

指纹

探究 'Polynomial algorithm for cyclic scheduling of a complex no-wait robotic production system' 的科研主题。它们共同构成独一无二的指纹。

引用此