Multi-echelon inventory allocation of multi-indenture spare parts considering maintenance ratio

Jun Xia, Yunwen Feng, Xiaofeng Xue, Cheng Lu

科研成果: 期刊稿件会议文章同行评审

1 引用 (Scopus)

摘要

The existing multi-indenture spare parts maintenance has a certain maintenance proportion, a multi-echelon inventory allocation method with maintenance ratio for multi-indenture spare parts was proposed. Multi-echelon inventory allocation model for multi-indenture spare parts was established, which integrates maintenance rate into METRIC (Multi-echelon technique for recoverable item control) model, and then the marginal analysis method was applied to solve this model. First, the theory of multi-echelon inventory allocation model with maintenance ratio for multi-indenture spare parts was elaborated, and the mathematical model was established with the spare parts inventory cost as the optimization objective, the fleet availability as the constraints. Then, the procedure of solving the model by using marginal analysis method is discussed. Finally, taking an aircraft multi-indenture LRU (Line repairable units) as the research object, multi-echelon inventory allocation was investigated by considering maintenance ratio. The feasibility and effectiveness of the developed method are verified by an example analysis.

源语言英语
文章编号012047
期刊IOP Conference Series: Materials Science and Engineering
715
1
DOI
出版状态已出版 - 3 1月 2020
活动3rd International Conference on Material Engineering and Advanced Manufacturing Technology, MEAMT 2019 - Shanghai, 中国
期限: 26 4月 201928 4月 2019

指纹

探究 'Multi-echelon inventory allocation of multi-indenture spare parts considering maintenance ratio' 的科研主题。它们共同构成独一无二的指纹。

引用此