摘要
This paper addresses multi-degree cyclic scheduling of two robots in a no-wait flowshop, where exactly r(r > 1) identical parts with constant processing times enter and leave the production line during each cycle, and transportation of the parts between machines is performed by two robots on parallel tracks. The objective is to minimize the cycle time. The problem is transformed into enumeration of pairs of overlapping moves that cannot be performed by the same robot. This enumeration is accomplished by enumerating intervals for some linear functions of decision variables. The algorithm developed is polynomial in the number of machines for a fixed r, but exponential if r is arbitrary. Computational results with benchmark instances are reported.
源语言 | 英语 |
---|---|
页(从-至) | 173-183 |
页数 | 11 |
期刊 | IEEE Transactions on Automation Science and Engineering |
卷 | 2 |
期 | 2 |
DOI | |
出版状态 | 已出版 - 4月 2005 |
已对外发布 | 是 |