Hybrid branch and bound algorithms for the two-stage assembly scheduling problem with separated setup times

Jian Chao Luo, Zhi Qiang Liu, Ke Yi Xing

科研成果: 期刊稿件文章同行评审

23 引用 (Scopus)

摘要

This article proposes hybrid branch and bound algorithms to minimise the makespan for the two-stage assembly scheduling problem with separated setup times. In the studied problem, there are multiple machines at the first stage, each of which produces a component of a job. When all components are available, a single assembly machine at the second stage completes the job. Existing algorithms are based on the state space search and hence suffer from the state space explosion problem. In order to reduce the search space, lower and upper bounds for a partial schedule are proposed. Also, a heuristic function and a dominance rule are developed to guide the search process. Moreover, accelerated factors are introduced to increase the speed of the search. Experimental results indicate that our algorithms outperform an existing method, and can find the optimal or near-optimal schedules in a short time for all tested problems with up to ten thousand jobs and nine first-stage machines.

源语言英语
页(从-至)1398-1412
页数15
期刊International Journal of Production Research
57
5
DOI
出版状态已出版 - 4 3月 2019

指纹

探究 'Hybrid branch and bound algorithms for the two-stage assembly scheduling problem with separated setup times' 的科研主题。它们共同构成独一无二的指纹。

引用此