This paper studies the cyclic jobshop hoist scheduling with multi-capacity reentrant tanks and time-window constraints. Parts of different types are processed in a series of tanks with bounded processing times. Multi-capacity tanks are used to handle stages with long processing times. Tanks can be reentrant so that a part visits them more than once. A hoist is responsible for the transportation of parts between tanks. We consider the cyclic scheduling where multiple parts enter and leave the production line during a cycle. The difficulty to deal with the problem lies in how to effectively handle the constraints related to multi-capacity reentrant tanks and their relations with time windows. To this end, a mixed-integer linear programming model is developed by addressing the time-window constraints and tank capacity constraints in a novel way. Computational experiments are conducted to demonstrate the effectiveness of the proposed model.

源语言英语
页(从-至)382-391
页数10
期刊Computers and Industrial Engineering
120
DOI
出版状态已出版 - 6月 2018

指纹

探究 'Cyclic jobshop hoist scheduling with multi-capacity reentrant tanks and time-window constraints' 的科研主题。它们共同构成独一无二的指纹。

引用此