A new method for generating work breakdown structure on aircraft assembly scheduling

Jie Zhang, Yuan Li, Jian Feng Yu, Kai Fu Zhang

科研成果: 书/报告/会议事项章节会议稿件同行评审

2 引用 (Scopus)

摘要

Based on assembly order, a new method for generating work breakdown structure was proposed on aircraft assembly scheduling, which can effectively improve tine control ability of assembly workshop. In the method, firstly, a three-layer unit partition model of assembly operation was established referring to the existing unit partition in assembly workshop, which refined foundation for assembly field control. Secondly, through information mapping rules between WBS and AO, assembly process information had been conveniently utilized in building assembly scheduling. Finally the WBS generating method for outline tasks and node tasks were found by assembly operation model and information mapping rules. In addition, the implementai technique and the application of the aircraft assembly field were introduced, and the result demonstrated the functionality of the method.

源语言英语
主期刊名2008 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2008
DOI
出版状态已出版 - 2008
活动2008 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2008 - Dalian, 中国
期限: 12 10月 200814 10月 2008

出版系列

姓名2008 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2008

会议

会议2008 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2008
国家/地区中国
Dalian
时期12/10/0814/10/08

指纹

探究 'A new method for generating work breakdown structure on aircraft assembly scheduling' 的科研主题。它们共同构成独一无二的指纹。

引用此