TY - GEN
T1 - Research on scene simulation of buoy launched device system
AU - Pan, Guang
AU - Wei, Jing
PY - 2013
Y1 - 2013
N2 - For the buoy being launched in the sea, the cost of great number of experiments is very high. It is difficult to get an overall understanding of the process. Aiming at the problems, the visualization of the entire process was realized. Based on Multigen Creator, the three-dimensional models of submarine, buoy, airbag and sleeves were built. Combined simulation program in Vega Prime, the trajectory of the buoy was simulated. In the process of simulation, the viewing angle of the target could be switched for full range of observations. The interaction between users and the simulation system made the relevant person to conveniently and intuitively observe and assess the status of buoys being operated.
AB - For the buoy being launched in the sea, the cost of great number of experiments is very high. It is difficult to get an overall understanding of the process. Aiming at the problems, the visualization of the entire process was realized. Based on Multigen Creator, the three-dimensional models of submarine, buoy, airbag and sleeves were built. Combined simulation program in Vega Prime, the trajectory of the buoy was simulated. In the process of simulation, the viewing angle of the target could be switched for full range of observations. The interaction between users and the simulation system made the relevant person to conveniently and intuitively observe and assess the status of buoys being operated.
KW - Buoy
KW - Scene simulation
KW - Three-dimensional models
KW - Vega Prime
UR - http://www.scopus.com/inward/record.url?scp=84887420678&partnerID=8YFLogxK
U2 - 10.4028/www.scientific.net/AMM.433-435.1921
DO - 10.4028/www.scientific.net/AMM.433-435.1921
M3 - 会议稿件
AN - SCOPUS:84887420678
SN - 9783037858943
T3 - Applied Mechanics and Materials
SP - 1921
EP - 1925
BT - Advances in Mechatronics and Control Engineering II
T2 - 2013 2nd International Conference on Mechatronics and Control Engineering, ICMCE 2013
Y2 - 28 August 2013 through 29 August 2013
ER -