@inproceedings{4e8db569a0f349ca9984c29a5fa435b2,
title = "Project scheduling in AND-OR Graphs based on Design Structure Matrix",
abstract = "This paper considers a project scheduling problem in AND-OR Graphs which include two types of nodes to represent the relationship of predecessor and successor. The problem is to find the earliest starting times for all activities and calculate the project duration. Using the Design Structure Matrix to capture the information flow between two tasks, a model was given to solve the problem in this paper.",
keywords = "AND-OR Graphs, Design Structure Matrix, Project scheduling problem",
author = "Lidi Ren and Sijun Bai and Yuntao Guo",
year = "2010",
doi = "10.1109/ICEMMS.2010.5563476",
language = "英语",
isbn = "9781424460625",
series = "Proceedings - 2010 IEEE International Conference on Emergency Management and Management Sciences, ICEMMS 2010",
pages = "161--164",
booktitle = "Proceedings - 2010 IEEE International Conference on Emergency Management and Management Sciences, ICEMMS 2010",
note = "2010 IEEE International Conference on Emergency Management and Management Sciences, ICEMMS 2010 ; Conference date: 08-08-2010 Through 10-08-2010",
}