Fast work breakdown structure generation algorithm for aircraft assembly scheduling based on assembly order

Jie Zhang, Yuan Li, Jian Feng Yu, Kai Fu Zhang

Research output: Contribution to journalArticlepeer-review

2 Scopus citations

Abstract

To generate detailed assembly planning and improve fine control ability for assembly workshop, a generation algorithm of working structure decomposition based on assembly order was proposed on aircraft assembly scheduling. In the algorithm, a three-level assembly operation model was established according to the existing partition of work area and work station in workshop, which refined foundation for assembly field control. Through using information mapping rules between Work Breakdown Structure (WBS) and Assembly Order (AO), rapid integration of the assembly process information and the task information in workshop planning was realized. The WBS automatic generation method for outline task and node task were set up by assembly operation model and mapping rules. In addition, the implementation techniques and the application of the aircraft assembly field were introduced, and the result demonstrated the feasibility of the algorithm.

Original languageEnglish
Pages (from-to)333-338
Number of pages6
JournalJisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
Volume15
Issue number2
StatePublished - Feb 2009

Keywords

  • Aircraft
  • Assembly field
  • Assembly order
  • Mapping rules
  • Operational plan
  • Work breakdown structure

Fingerprint

Dive into the research topics of 'Fast work breakdown structure generation algorithm for aircraft assembly scheduling based on assembly order'. Together they form a unique fingerprint.

Cite this