A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints

Zhen Zhou, Ada Che, Pengyu Yan

Research output: Contribution to journalArticlepeer-review

43 Scopus citations

Abstract

This paper deals with the cyclic robotic flowshop scheduling problem with time window constraints, where parts are processed successively on multiple machines with upper and lower bounds on processing times and the transportation of parts among the machines is executed by a robot. In contrast with most previous studies, we consider the multi-cyclic scheduling problem in which two or more identical parts enter and leave the robotic flowshop during each cycle. We present the first mixed integer programming (MIP) model for the multi-cyclic robotic flowshop scheduling problem based on the description and analysis of the problem. We solve the model using commercial software CPLEX. Computational experiment on benchmark and randomly generated instances indicates that the proposed MIP approach can effectively solve real-life scheduling problems.

Original languageEnglish
Pages (from-to)3621-3629
Number of pages9
JournalApplied Mathematical Modelling
Volume36
Issue number8
DOIs
StatePublished - Aug 2012

Keywords

  • Mixed integer programming
  • Multi-cyclic scheduling
  • Robotic flowshop
  • Time window constraints

Fingerprint

Dive into the research topics of 'A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints'. Together they form a unique fingerprint.

Cite this