摘要
We consider a single-job model lot streaming problem in two-machine flow shops with speed scaling, in which the job can be splitted into n consistent sublots, and each sublot can be processed at varying continuous speeds on each machine. The aim is to find an optimal schedule that determines both the sizes and the processing speeds of sublots so that the job can be finished before a given deadline and the total energy consumption is minimized. To solve this problem, we investigate the structural properties of the optimal schedules and show that it can be obtained within a no-wait environment. Then, we show that the problem is in fact a convex optimization problem, and can be solved by existing convex programming techniques.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 2429-2441 |
| 页数 | 13 |
| 期刊 | Journal of the Operational Research Society |
| 卷 | 72 |
| 期 | 11 |
| DOI | |
| 出版状态 | 已出版 - 2021 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源
学术指纹
探究 'Speed scaling in two-machine lot-streaming flow shops with consistent sublots' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver