跳到主要导航 跳到搜索 跳到主要内容

Scheduling multiple robots in a no-wait re-entrant robotic flowshop

  • Ada Che
  • , Michelle Chabrol
  • , Michel Gourgand
  • , Yuan Wang
  • Université Blaise Pascal
  • Northwestern Polytechnical University Xian

科研成果: 期刊稿件文章同行评审

35 引用 (Scopus)

摘要

No-wait re-entrant robotic flowshops are widely used in the electronic industry, such as PCB and semiconductor manufacturing. In such an industry, cyclic production policy is often used due to large lot size and simplicity of implementation. This paper addresses cyclic scheduling of a no-wait re-entrant robotic flowshop with multiple robots for material handling. We formulate the problem and propose a polynomial algorithm to find the minimum number of robots for all feasible cycle times. Consequently, the minimum cycle time for any given number of robots can be obtained with the proposed algorithm. The algorithm runs in O(N5) time in the worst case, where N is the number of machines in the robotic flowshop.

源语言英语
页(从-至)199-208
页数10
期刊International Journal of Production Economics
135
1
DOI
出版状态已出版 - 1月 2012

学术指纹

探究 'Scheduling multiple robots in a no-wait re-entrant robotic flowshop' 的科研主题。它们共同构成独一无二的学术指纹。

引用此