N2 - Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.
AB - Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.
KW - Construction optimization
KW - Design optimization
KW - IKEA model
KW - Prefabricated construction
KW - Virtual Prototyping
UR - https://www.scopus.com/pages/publications/79952377493
U2 - 10.1080/01446193.2010.545994
DO - 10.1080/01446193.2010.545994
M3 - 文章
AN - SCOPUS:79952377493
SN - 0144-6193
VL - 29
SP - 233
EP - 245
JO - Construction Management and Economics
JF - Construction Management and Economics
IS - 3
ER -