摘要
This paper combined genetic algorithm and contract net protocol and presented a production scheduling and reservation algorithm to produce an optimum schedule and to allocate the outsourcing tasks to appropriate partners, reaching optimized resource allocation in manufacturing supply chain level. The algorithm was testified and proved with a real production case study.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 305-310 |
| 页数 | 6 |
| 期刊 | Zhongguo Jixie Gongcheng/China Mechanical Engineering |
| 卷 | 20 |
| 期 | 3 |
| 出版状态 | 已出版 - 10 2月 2009 |
学术指纹
探究 'Production scheduling techniques for process cooperation oriented mobilized collaborative manufacturing' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver