摘要
To deal with cyclic scheduling problem of a complicated no-wait robotic production system in automatic manufacturing system which was characterized by its parallel work stations and re-enter work stations, a mathematical model was set up by a set of forbidden intervals for the cycle time. Then an optimal polynomial algorithm was developed. Effectiveness of the algorithm was verified by an application example of an electroplating line in Printed Circuit Board (PCB) manufacturing.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 1616-1623 |
| 页数 | 8 |
| 期刊 | Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS |
| 卷 | 13 |
| 期 | 8 |
| 出版状态 | 已出版 - 8月 2007 |
学术指纹
探究 'Polynomial algorithm for cyclic scheduling of a complex no-wait robotic production system' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver