摘要
The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation - enabling a range of 'what-if' questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 912-918 |
| 页数 | 7 |
| 期刊 | Automation in Construction |
| 卷 | 18 |
| 期 | 7 |
| DOI | |
| 出版状态 | 已出版 - 11月 2009 |
| 已对外发布 | 是 |
学术指纹
探究 'Optimizing construction planning schedules by virtual prototyping enabled resource analysis' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver