摘要
To investigate the installed performance of turbine based combined cycle engines, based on Hypersonic Strike Fighter proposed by Georgia Institute of Technology, parallel configuration was selected as a turbofan-ram combined engine. The work process and the determination of transition mode point of turbo-ramjet were described. The installed loss computational model and installed performance computational model were established. The installed performance characteristics of turbo-ramjet were simulated by numerical method. The investigation indicates that the engine installed performance can meet the requirement of aircraft.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 312-317+322 |
| 期刊 | Tuijin Jishu/Journal of Propulsion Technology |
| 卷 | 32 |
| 期 | 3 |
| 出版状态 | 已出版 - 6月 2011 |
指纹
探究 'Numerical simulation of installed performance for parallel turbo-ramjet combined cycle engine' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver