跳到主要导航 跳到搜索 跳到主要内容

Delay analysis of distributed reservation protocol with UWB shadowing channel for WPAN

  • University of Waterloo
  • University of Victoria BC

科研成果: 书/报告/会议事项章节会议稿件同行评审

7 引用 (Scopus)

摘要

Ultra-wideband (UWB) technology is expected to provide high data rate services for future wireless personal area networks (WPANs). The WiMedia Alliance recently has launched its standard for UWB-based WPANs, where the distributed reservation protocol (DRP) is specified to allow the channel time being reserved in a distributed manner. In view of the urgent need of using DRP to support high data rate multimedia applications, we investigate the delay performance of DRP in this paper. Since the negotiation of channel time is fully distributed without centralized coordination, the reserved channel time may be non-evenly spaced. In addition, the channel dynamics due to shadowing that is notable in indoor environments can greatly affect the protocol performance. In this paper, we study the delay performance of DRP under different reservation patterns and take into account the dynamics of UWB shadowing channel. The system is modeled as a discrete-time single server queue with vacation, which can be represented by the quasi-birth and death (QBD) process and solved by the well-established matrix-geometric approach. We use numerical results to validate the accuracy of the mathematical modeling. The proposed analytical model can be useful to understand the actual performance of DRP, thereby further performance improvement can be guided.

源语言英语
主期刊名ICC 2008 - IEEE International Conference on Communications, Proceedings
2769-2774
页数6
DOI
出版状态已出版 - 2008
已对外发布
活动IEEE International Conference on Communications, ICC 2008 - Beijing, 中国
期限: 19 5月 200823 5月 2008

出版系列

姓名IEEE International Conference on Communications
ISSN(印刷版)0536-1486

会议

会议IEEE International Conference on Communications, ICC 2008
国家/地区中国
Beijing
时期19/05/0823/05/08

指纹

探究 'Delay analysis of distributed reservation protocol with UWB shadowing channel for WPAN' 的科研主题。它们共同构成独一无二的指纹。

引用此