摘要
This article studies the speed-scaling robotic cell scheduling problem with constrained peak power consumption. The objective is to minimize cycle time and peak power consumption simultaneously. First, we formulate a bi-objective mixed integer programming model for the problem and propose a strategy to preprocess overlapping time windows. Then, we analyze the structural properties of the proposed model and develop an iterative "-constraint method to generate its complete Pareto front.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 7522-7539 |
| 页数 | 18 |
| 期刊 | Journal of Industrial and Management Optimization |
| 卷 | 19 |
| 期 | 10 |
| DOI | |
| 出版状态 | 已出版 - 10月 2023 |
学术指纹
探究 'BI-OBJECTIVE SPEED-SCALING ROBOTIC CELL SCHEDULING WITH PEAK POWER CONSUMPTION CONSTRAINT' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver