Applied research of earned value theory in the engineering project management

  • Northwestern Polytechnical University Xian

科研成果: 书/报告/会议事项章节会议稿件同行评审

5 引用 (Scopus)

摘要

The three objectives of a project are quality, cost and schedule, and the traditional EV theory is on the integrated control of schedule and cost. In this paper, the quality is considered, so that the three objectives can be controlled at the same time. This paper establishes a tri-relationship among them using an econometric mode, analyzes the state of a project at a certain time, determines the cost overruns or savings, the schedule delay or ahead of, uses the relationship between time and cost and takes effective corrective measures to achieve dynamic and optimal management.

源语言英语
主期刊名ICEMMS 2011 - Proceedings
主期刊副标题2011 2nd IEEE International Conference on Emergency Management and Management Sciences
595-598
页数4
DOI
出版状态已出版 - 2011
活动2011 2nd IEEE International Conference on Emergency Management and Management Sciences, ICEMMS 2011 - Beijing, 中国
期限: 8 8月 201110 8月 2011

出版系列

姓名ICEMMS 2011 - Proceedings: 2011 2nd IEEE International Conference on Emergency Management and Management Sciences

会议

会议2011 2nd IEEE International Conference on Emergency Management and Management Sciences, ICEMMS 2011
国家/地区中国
Beijing
时期8/08/1110/08/11

指纹

探究 'Applied research of earned value theory in the engineering project management' 的科研主题。它们共同构成独一无二的指纹。

引用此