摘要
Cyber physical system (CPS) enables companies to keep high traceability and controllability in manufacturing for better quality and improved productivity. However, several challenges including excessively long waiting time and a serious waste of energy still exist on the shop-floor where limited buffer exists for each machine (e.g., shop-floor that manufactures large-size products). The production logistics tasks are released after work-in-processes (WIPs) are processed, and the machines will be occupied before trolleys arrival when using passive material handling strategy. To address this issue, a proactive material handling method for CPS enabled shop-floor (CPS-PMH) is proposed. Firstly, the manufacturing resources (machines and trolleys) are made smart by applying CPS technologies so that they are able to sense, act, interact and behave within a smart environment. Secondly, a shop-floor digital twin model is created, aiming to reflect their status just like real-life objects, and key production performance indicators can be analysed timely. Then, a time-weighted multiple linear regression method (TWMLR) is proposed to forecast the remaining processing time of WIPs. A proactive material handling model is designed to allocate smart trolleys optimally. Finally, a case study from Southern China is used to validate the proposed method and results show that the proposed CPS-PMH can largely reduce the total non-value-added energy consumption of manufacturing resources and optimize the routes of smart trolleys.
| 源语言 | 英语 |
|---|---|
| 文章编号 | 101849 |
| 期刊 | Robotics and Computer-Integrated Manufacturing |
| 卷 | 61 |
| DOI | |
| 出版状态 | 已出版 - 2月 2020 |
联合国可持续发展目标
此成果有助于实现下列可持续发展目标:
-
可持续发展目标 7 经济适用的清洁能源
指纹
探究 'A proactive material handling method for CPS enabled shop-floor' 的科研主题。它们共同构成独一无二的指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver