摘要
Preventive maintenance may be performed on a few selected components when a component fails. Importance measures can be used to identify the most important component that requires maintenance. However, this process involves two problems: (a) the preventive maintenance time of the selected component may be bigger than the maintenance time of the failed component; (b) the most important component may incur the highest maintenance cost. Traditional importance measures do not consider the possible effect of maintenance time and cost, which significantly affect the improvement of system reliability. Given the joint effect of component maintenance cost and time on system reliability, this study proposes a cost-based integrated importance measure (IIM) to identify the component or group of components that may be selected for preventive maintenance. The characteristics of cost-based IIM are examined to determine the relationships among failure rates, shape parameters, and the scale parameters of different components. Finally, an application to a wind turbine system is used to illustrate its usage.
| 源语言 | 英语 |
|---|---|
| 页(从-至) | 98-104 |
| 页数 | 7 |
| 期刊 | Reliability Engineering and System Safety |
| 卷 | 168 |
| DOI | |
| 出版状态 | 已出版 - 12月 2017 |
学术指纹
探究 'A cost-based integrated importance measure of system components for preventive maintenance' 的科研主题。它们共同构成独一无二的学术指纹。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver