Abstract
This paper combined genetic algorithm and contract net protocol and presented a production scheduling and reservation algorithm to produce an optimum schedule and to allocate the outsourcing tasks to appropriate partners, reaching optimized resource allocation in manufacturing supply chain level. The algorithm was testified and proved with a real production case study.
Original language | English |
---|---|
Pages (from-to) | 305-310 |
Number of pages | 6 |
Journal | Zhongguo Jixie Gongcheng/China Mechanical Engineering |
Volume | 20 |
Issue number | 3 |
State | Published - 10 Feb 2009 |
Keywords
- Mobilized collaborative manufacturing
- Outsourcing
- Process cooperation
- Production reservation
- Scheduling
- Virtual enterprise