Abstract
The multimode resource-constrained projectscheduling problem (MRCPSP) considers both renewable and nonrenewable resources that have not been addressed efficiently in the construction field. This article introduces a methodology for solving the MRCPSP based on particle swarm optimization (PSO) that has not been utilized for this and other construction-related problems. The framework of the PSO-based methodology is developed. Aparticle representation formulation is proposed to represent the potential solution to the MRCPSP in terms of priority combination and mode combination for activities. Each particle-represented solution should be checked against the nonrenewable resource infeasibility and will be handled by adjusting the mode combination. The feasible particle-represented solution is transformed to a schedule through a serial generation scheme. Experimental analyses are presented to investigate the performance of the proposed methodology.
| Original language | English |
|---|---|
| Pages (from-to) | 93-103 |
| Number of pages | 11 |
| Journal | Computer‐Aided Civil and Infrastructure Engineering |
| Volume | 21 |
| Issue number | 2 |
| DOIs | |
| State | Published - Feb 2006 |
| Externally published | Yes |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver