Abstract
This paper addresses cyclic scheduling of a single hoist in large real-life electroplating lines, where a part visits some processing tanks more than once and multiple duplicate tanks are used at some production stages having long processing times. We present a formal analysis of the problem and propose an efficient branch-and-bound algorithm. The developed analytical properties allow us to considerably eliminate dominated or infeasible solutions in the branch-and-bound procedure. Computational results on benchmark and real-life instances show that the algorithm is very efficient in scheduling large electroplating lines.
| Original language | English |
|---|---|
| Pages (from-to) | 445-470 |
| Number of pages | 26 |
| Journal | OR Spectrum |
| Volume | 29 |
| Issue number | 3 |
| DOIs | |
| State | Published - Jul 2007 |
Keywords
- Cyclic scheduling
- Electroplating lines
- Hoist scheduling
- Production systems
Fingerprint
Dive into the research topics of 'Cyclic hoist scheduling in large real-life electroplating lines'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver