Abstract
With the proliferation of increasingly powerful mobile devices and wireless networks, mobile crowdsourcing has emerged as a novel service paradigm. It enables crowd workers to take over outsourced location-dependent tasks, and has attracted much attention from both research communities and industries. In this paper, we consider a mobile crowdsourcing scenario, where a mobile crowdsourcing task is too complex (e.g., post-earthquake recovery, citywide package delivery) but can be divided into a number of easier subtasks, which have interdependency between them. Under this scenario, we investigate an important problem, namely task graph scheduling in mobile crowdsourcing (TGS-MC), which seeks to optimize a compact scheduling, such that the task completion time (i.e., makespan) and overall idle time are simultaneously minimized with the consideration of worker reliability. We analyze the complexity and NP-complete of the TGS-MC problem, and propose two heuristic approaches, including BFS-based dynamic priority scheduling BFSPriD algorithm, and an evolutionary multitasking-based EMTTSch algorithm, to solve our problem from local and global optimization perspective, respectively. We conduct extensive evaluation using two real-world data sets, and demonstrate superiority of our proposed approaches.
| Original language | English |
|---|---|
| Pages (from-to) | 2358-2371 |
| Number of pages | 14 |
| Journal | IEEE Transactions on Mobile Computing |
| Volume | 21 |
| Issue number | 7 |
| DOIs | |
| State | Published - 1 Jul 2022 |
Keywords
- Mobile crowdsourcing
- directed acyclic graph(DAG)
- makespan
- task schedule
Fingerprint
Dive into the research topics of 'Compact Scheduling for Task Graph Oriented Mobile Crowdsourcing'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver