Abstract
This article studies the speed-scaling robotic cell scheduling problem with constrained peak power consumption. The objective is to minimize cycle time and peak power consumption simultaneously. First, we formulate a bi-objective mixed integer programming model for the problem and propose a strategy to preprocess overlapping time windows. Then, we analyze the structural properties of the proposed model and develop an iterative "-constraint method to generate its complete Pareto front.
Original language | English |
---|---|
Pages (from-to) | 7522-7539 |
Number of pages | 18 |
Journal | Journal of Industrial and Management Optimization |
Volume | 19 |
Issue number | 10 |
DOIs | |
State | Published - Oct 2023 |
Keywords
- cyclic scheduling
- peak power consumption
- Robotic cell
- speed-scaling machines