BI-OBJECTIVE SPEED-SCALING ROBOTIC CELL SCHEDULING WITH PEAK POWER CONSUMPTION CONSTRAINT

Ada Che, Sihan Zhang, Yipei Zhang, Jianguang Feng

Research output: Contribution to journalArticlepeer-review

2 Scopus citations

Abstract

This article studies the speed-scaling robotic cell scheduling problem with constrained peak power consumption. The objective is to minimize cycle time and peak power consumption simultaneously. First, we formulate a bi-objective mixed integer programming model for the problem and propose a strategy to preprocess overlapping time windows. Then, we analyze the structural properties of the proposed model and develop an iterative "-constraint method to generate its complete Pareto front.

Original languageEnglish
Pages (from-to)7522-7539
Number of pages18
JournalJournal of Industrial and Management Optimization
Volume19
Issue number10
DOIs
StatePublished - Oct 2023

Keywords

  • cyclic scheduling
  • peak power consumption
  • Robotic cell
  • speed-scaling machines

Fingerprint

Dive into the research topics of 'BI-OBJECTIVE SPEED-SCALING ROBOTIC CELL SCHEDULING WITH PEAK POWER CONSUMPTION CONSTRAINT'. Together they form a unique fingerprint.

Cite this