Abstract
This paper addresses the single-track multi-hoist cyclic scheduling problem. In most existing studies, loaded hoist moves are implicitly or explicitly assumed to start and end within the same cycle. We give a counterexample to demonstrate that the optimal solution obtained with such an assumption is not necessarily the best one among all feasible solutions, called globally optimal solution. To obtain a globally optimal solution, we propose an improved mixed integer programming (MIP) approach for the multi-hoist cyclic scheduling problem with relaxation of the above assumption. Computational results on benchmark and randomly generated instances are reported and analyzed.
| Original language | English |
|---|---|
| Article number | 6522200 |
| Pages (from-to) | 302-309 |
| Number of pages | 8 |
| Journal | IEEE Transactions on Automation Science and Engineering |
| Volume | 11 |
| Issue number | 1 |
| DOIs | |
| State | Published - Jan 2014 |
Keywords
- Cyclic scheduling
- Mixed integer programming
- Multi-hoist scheduling
Fingerprint
Dive into the research topics of 'An improved mixed integer programming approach for multi-hoist cyclic scheduling problem'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver