Skip to main navigation Skip to search Skip to main content

An improved mixed integer programming approach for multi-hoist cyclic scheduling problem

  • Ada Che
  • , Weidong Lei
  • , Jianguang Feng
  • , Chengbin Chu
  • Northwestern Polytechnical University Xian
  • Grande Voie des Vignes

Research output: Contribution to journalArticlepeer-review

32 Scopus citations

Abstract

This paper addresses the single-track multi-hoist cyclic scheduling problem. In most existing studies, loaded hoist moves are implicitly or explicitly assumed to start and end within the same cycle. We give a counterexample to demonstrate that the optimal solution obtained with such an assumption is not necessarily the best one among all feasible solutions, called globally optimal solution. To obtain a globally optimal solution, we propose an improved mixed integer programming (MIP) approach for the multi-hoist cyclic scheduling problem with relaxation of the above assumption. Computational results on benchmark and randomly generated instances are reported and analyzed.

Original languageEnglish
Article number6522200
Pages (from-to)302-309
Number of pages8
JournalIEEE Transactions on Automation Science and Engineering
Volume11
Issue number1
DOIs
StatePublished - Jan 2014

Keywords

  • Cyclic scheduling
  • Mixed integer programming
  • Multi-hoist scheduling

Fingerprint

Dive into the research topics of 'An improved mixed integer programming approach for multi-hoist cyclic scheduling problem'. Together they form a unique fingerprint.

Cite this