TY - GEN
T1 - A new method for generating work breakdown structure on aircraft assembly scheduling
AU - Zhang, Jie
AU - Li, Yuan
AU - Yu, Jian Feng
AU - Zhang, Kai Fu
PY - 2008
Y1 - 2008
N2 - Based on assembly order, a new method for generating work breakdown structure was proposed on aircraft assembly scheduling, which can effectively improve tine control ability of assembly workshop. In the method, firstly, a three-layer unit partition model of assembly operation was established referring to the existing unit partition in assembly workshop, which refined foundation for assembly field control. Secondly, through information mapping rules between WBS and AO, assembly process information had been conveniently utilized in building assembly scheduling. Finally the WBS generating method for outline tasks and node tasks were found by assembly operation model and information mapping rules. In addition, the implementai technique and the application of the aircraft assembly field were introduced, and the result demonstrated the functionality of the method.
AB - Based on assembly order, a new method for generating work breakdown structure was proposed on aircraft assembly scheduling, which can effectively improve tine control ability of assembly workshop. In the method, firstly, a three-layer unit partition model of assembly operation was established referring to the existing unit partition in assembly workshop, which refined foundation for assembly field control. Secondly, through information mapping rules between WBS and AO, assembly process information had been conveniently utilized in building assembly scheduling. Finally the WBS generating method for outline tasks and node tasks were found by assembly operation model and information mapping rules. In addition, the implementai technique and the application of the aircraft assembly field were introduced, and the result demonstrated the functionality of the method.
KW - Assembly field
KW - Assembly operation scheduling
KW - Assembly order
KW - Work breakdown structure
UR - https://www.scopus.com/pages/publications/58049118083
U2 - 10.1109/WiCom.2008.3027
DO - 10.1109/WiCom.2008.3027
M3 - 会议稿件
AN - SCOPUS:58049118083
SN - 9781424421084
T3 - 2008 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2008
BT - 2008 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2008
T2 - 2008 International Conference on Wireless Communications, Networking and Mobile Computing, WiCOM 2008
Y2 - 12 October 2008 through 14 October 2008
ER -