TY - JOUR
T1 - A heuristic algorithm for cell formation problems with consideration of multiple production factors
AU - Liu, Chenguang
AU - Yin, Yong
AU - Yasuda, Kazuhiko
AU - Lian, Jie
PY - 2010/2
Y1 - 2010/2
N2 - For the design of manufacturing cells, numerous mathematical models and various algorithms have been extensively investigated in the literature. However, most of the proposed models and algorithms have more or fewer drawbacks on the issues with real-life situations. In this paper, we propose a mathematical model that incorporates multiple key real-life production factors simultaneously, namely, production volume, batch size, alternative process routings and perfect coefficient of each routing, cell size, unit cost of intercell/intracell movements, and path coefficient of material flows. Then, to solve this NP-hard model, we develop a heuristic algorithm with three stages: (1) form the temporary machine group plan according to the alternative process routings of each part, (2) select the appropriate process routing of each part with respect to the over-all material movement cost, and (3) configure the regular manufacturing cells based on the appropriate process routing. A simple numerical example and an industrial case are used to test the computational performance of the proposed algorithm. The test results imply that it is useful for manufacturing cell design in both quality and speed.
AB - For the design of manufacturing cells, numerous mathematical models and various algorithms have been extensively investigated in the literature. However, most of the proposed models and algorithms have more or fewer drawbacks on the issues with real-life situations. In this paper, we propose a mathematical model that incorporates multiple key real-life production factors simultaneously, namely, production volume, batch size, alternative process routings and perfect coefficient of each routing, cell size, unit cost of intercell/intracell movements, and path coefficient of material flows. Then, to solve this NP-hard model, we develop a heuristic algorithm with three stages: (1) form the temporary machine group plan according to the alternative process routings of each part, (2) select the appropriate process routing of each part with respect to the over-all material movement cost, and (3) configure the regular manufacturing cells based on the appropriate process routing. A simple numerical example and an industrial case are used to test the computational performance of the proposed algorithm. The test results imply that it is useful for manufacturing cell design in both quality and speed.
KW - Cell formation
KW - Cellular manufacturing system
KW - Heuristic algorithm
KW - Multiple production factors
UR - http://www.scopus.com/inward/record.url?scp=77349089925&partnerID=8YFLogxK
U2 - 10.1007/s00170-009-2170-0
DO - 10.1007/s00170-009-2170-0
M3 - 文章
AN - SCOPUS:77349089925
SN - 0268-3768
VL - 46
SP - 1201
EP - 1213
JO - International Journal of Advanced Manufacturing Technology
JF - International Journal of Advanced Manufacturing Technology
IS - 9-12
ER -